1. Other
  2. WASA - 2018 Pilot Green Infrastructure Program - Negative Impact of PBR-1309 on Madison St. home - Green River Project $2.6B - Green River Project A $25M - NO GROUNDWATER TESTING FOR HIGH WATER TABLE ?? WHY NOT?? YOU DIDN"T CHECK - REMOVE PBR 1309

  • Street - Sidewalk - Treebox - Alley Infrastructure

    Street - Sidewalk - Treebox - Alley Infrastructure

  • Probable Dangers Under My Home due to the installation of Bioretention Planter PBR-1309

    Probable Dangers Under My Home due to the installation of Bioretention Planter PBR-1309

  • 5-7-2020 Downhill Groundwater runoff from 5-6 rain

    5-7-2020 Downhill Groundwater runoff from 5-6 rain

  • Retaining Wall Before and After PBR-1309 Installation

    Retaining Wall Before and After PBR-1309 Installation

  • DC Water / Anchor Management CUT Gas Line without notice.

    DC Water / Anchor Management CUT Gas Line without notice.

  • Groundwater flowed under the street until blocked by PBR-1309

    Groundwater flowed under the street until blocked by PBR-1309

  • Madison St. Basement Renovations

    Madison St. Basement Renovations

  • WASA Green River Project A - Bioretention Planter: PBR 1309 - HIGH WATER TABLE

    WASA Green River Project A - Bioretention Planter: PBR 1309 - HIGH WATER TABLE

  • Timeline - WASA Green River Project A - Bioretention Planter: PBR 1309 - HIGH WATER TABLE

    Timeline - WASA Green River Project A - Bioretention Planter: PBR 1309 - HIGH WATER TABLE

  • Neighborhood Videos - WASA - 2018 Pilot Green Infrastructure Program

    Neighborhood Videos - WASA - 2018 Pilot Green Infrastructure Program

  • Photo Sharing
  • About SmugMug
  • Browse Photos
  • Prints & Gifts
  • Terms
  • Privacy
  • Contact
  • Owner Log In
© 2023 SmugMug, Inc.